First slide

ARC Projects

Projects

Delivered a 240 ton Landing Craft Hull. ARC also fabricated and installed all piping systems. The project was won withstanding stiff competition and delivered one week ahead of the scheduled delivery date. The vessels was displayed at the IDEX at Abu Dhabi in 2019.

Landing Craft

ARC has fabricated and delivered in excess of 30 Diving Decompression Chambers with compliance to the stringent quality requirements of PVHO (Pressure Vessels for Human Occupancy) and ABS.

Diving Decompression Chamber

Fabricated, tested and assembled 40 numbers of 16 cylinder and 40 numbers of 64 cylinder gas quads. All quads were certified to DNV-GL requirements and complied for offshore usage.

Cylinder Quads

This Deck Extension, a fast track job offered by a major Oil & Gas company of UAE, was to be installed in segments offshore. It required fabrication/ load testing and preassembly fit up checks of the 80 ton deck extension.

Deck Extension

ARC was appointed to fabricate and install a 30 ton base frame with ASME coded spools on a marine vessel in Abu Dhabi. The client subsequently gave us a repeat order for a similar project.

SPHL On Site

Fabrication of a 23 metre high Radar Tower for an Offshore platform.

Radar Tower

This Fuel Gas Module was a fast track job which required procurement of equipment, E&I work, fabrication and assembly of the module in three weeks.

Fuel Gas Module

Fabrication and trial assembly of a 30 ton deck extension for an offshore drill rig.

Deck Extension

Another quick turnaround project involving fabrication & installation of a 16 ton Crane Pedestal for an offshore drill rig.

Crane Pedestal